fossil fuel

The Scotsman      Saturday, 25th September 2010

Published Date: 25 September 2010

As a one-time chartered electrical engineer and also a long standing member of the RSPB it was with increasing dismay that I read through the letter (23 September) from Messrs Dixon, Austin and McLaren of the WWF, RSPB and FoE (Scotland) respectively.

To refute all their misunderstandings, ill-understood technicalities and flawed recommendations would require at least half a page of this newspaper. I shall content myself with addressing one simple misconception and that is their weird belief that ADVERTISEMENT
wind farms can replace fossil-fuel electricity-generating plants.

The reality is that winds sometimes blow strongly and sometimes weakly and sometimes not at all, but because electricity is needed all the time, every wind farm has to be “backed up” by fossil-fuel fired plant of equal installed capacity.

When the wind blows, wind farm electricity can replace some, but not all, of the the fossil-fuel plant output and so reduce some, but not all, of its carbon emissions. When the wind doesn’t blow the back-up plant takes over.

The above consortium is proposing that by 2020 wind farms should provide 100 per cent of Scotland’s electricity needs.

This will require about 3,000 turbines with a total installed capacity of 10GW backed up by 10GW installed capacity of fossil fuel-generating plant. Perhaps seven or eight large coal fired power stations?

Instead of protesting against plans to build a coal-fired power station at Hunterston, they should instead be enthusiastically supporting it and pressing for the construction of the other six or seven. Only then will their cherished wind farms be a viable proposition.

William Oxenham

Easter Currie Place

Currie, Edinburgh

It is interesting to see the RSPB writing, in concert with other “environmental” subsidy lobbyists, for more government bungs to wind farmers.

A school which spent L20,000 on its own windmill recently turned it off because the sight of its continuous shredding of birds was not helping them give the pupils the desired “alternative” indoctrination.

Since the total number of birds killed by windmills is clearly many orders of magnitude more than those killed in the Caribbean oil release perhaps the RSPB could endorse something less harmful to its alleged clients, like more oil spills.


Neil Craig

Woodlands Road


To produce 80 per cent of Scotland’s electricity, never mind 100 per cent or even 50 per cent, from diffuse renewable methods (your report, 24 September and Letters, 23 September) some large-scale method of storing electricity would be required.

This is because the load factor of such methods is invariably below 50 per cent (wind is around 30 per cent but sometimes as low as 10 per cent); in 2008 such methods produced less that 20 per cent or our electricity.

In other words, the annual production from renewable methods can never exceed the load factor, which is a measure of how much time a generator actually spends generating.

Extra power can come from hydro (only about 9 per cent in Scotland) and other intermittent renewable methods (photovoltaic solar and tidal), but storage will still be required. The only large-scale storage at present are the pumped storage schemes at Foyers and Cruachan, but their combined capacity is only 700 MW.

Since Scottish demand can sometimes reach 7 GW (7000 MW), a storage system at least ten times greater than the pumped storage schemes would be required (more to meet rising demand in the future). Is this practical? It would be simpler to build new nuclear power stations.

Steuart Campbell

Dovecot Loan


Leave a Reply